2022年10月3日星期一

Isuzu Control Lever Assembly,Control Cable and Associated Parts Removal and Installation Guide

 This article mainly introduces Removal and Installation of the Isuzu  Control Lever Assembly,Control Cable and Associated Parts


Isuzu G-IDSS Diagnostic Service System 03.2022 Download and Installation


  Removal
1.Disconnect the batery ground cable.
2.Remove instrument panel driver lower cover assembly.
3.Remove knee Bolster Driver Panel Assembly.
4.Remove lower cluster assembly.5.Remove meter cluster assembly.
  ORefer to Instrument Panel Assembly and Cross Beam Assembly in Body Structure section.
6.Remove instrument panel lower center cover assembly.
7.Remove glove box.
8.Remove the control lever attaching screws.
9.Pull the control leverassembly out and disconnect the fan switch and air conditioning switch connectors.



ISUZU US-IDSS Diagnostic Service Truck Diagnostic System 06.2021


10. Remove the illumination bulb holder.
11. Remove fan control lever and/or air conditioning
  (AC) switch connector.
   OPull the A/C switch out and disconnect the connectors.


12.Remove control lever assembly.
13.Disconnect control cables at each unit side.


ISUZU Truck Workshop Service Repair Manual PDF Download




Installation To install, follow the removal steps in the reverse order, noting the following points:
1. Adjust the control cable.


OAir source control cable.
1. Slide the control lever to the left("CIRC"
   position).
2. Connect the control cable at the "CIRC"position of the link unit of the blower assembly and secure it with the clip.
   OTemperature control cable.

没有评论:

发表评论

How to Installation ISUZU 4JH1 Engine Intake Throttle Valve

  This article explains how to Installation ISUZU 4JH1 Engine Intake Throttle Valve   ISUZU IDSS MX2-T Diagnostic Adapter System Support G-...