2026年4月10日星期五

How to disassemble an Isuzu engine (Inlet Manifold)

 

 

  Components

                                                                         

Euro4 specification

 

 

ISUZU IDSS MX2-T Adapter Diagnostic Professional Tool High Quality

Euro2 specification

 

 

Legend

1.Inlet  manifold  gasket

2.Inlet   manifold

 

3.Cover   gasket

3.Inlet  manifold  cover

 

Legend

1.Inlet  manifold  gasket

2.Inlet   manifold

 

Removal

1.Disconnect the battery cable negative terminal.

2.Drain the engine coolant.

3.Remove the intake throttle valve.

Refer to "Intake Throttle Valve"in this Section.

 

4.Remove the heater pipe.

 

 

 [02.2025] ISUZU G-IDSS Global Truck Diagnostic Software Installation Service 

5.Remove the EGR valve.(Euro4 specification only)

Refer to "EGR Valve and EGR Cooler"in Section 6F,Engine  Exhaust.

 

6.Disconnect  the  engine   harness  clip.

 

 

Legend

1.Clip

2.Clip

3.Clip

7.Remove  the  leak-off  pipe.

 

 

 8.Disconnect  the   leak-off  hose  clamp.

 

 9.Remove the engine oil  level gauge and guide tube

10.Remove  the  injection  pipe.

NOTE:

Do not reuse the injection pipe.

11.Remove  the  oil  cooler  pipe.

Euro4   specification

 

 

 

 

 

 

 

 

 

Euro2   specification

  03.2026 ISUZU E-IDSS Diagnostic Software Download and install at high speed

12.Remove       the    inlet     manifold     cover.      (Euro2 specification  only)

13.Remove  the   inlet   manifold.

NOTE:

Do not reuse the gasket.

 

没有评论:

发表评论

How to disassemble an Isuzu engine (Inlet Manifold)

      Components                                                                           Euro4   specification     ISUZU IDSS MX2-T Adapte...