Installation
1.Installthe engine assembly to the vehicle.
·Position engine mountings by using hoist.
2.Install the support rubber.
·After all fixing bolts(left:two bolts,right:two bolts)
were inserted to every holes,and engine assembly and tighten fixing bolts to the specified torque
Tightening torque: 48 Nm(4.9 kg m/351b·ft)
ISUZU IDSS MX2-T Adapter Diagnostic Professional Tool High Quality
[02.2025] ISUZU G-IDSS Global Truck Diagnostic Software Installation Service
·P/S pump lock bolt loose,adjust belt tension with adjust belt.
Tightening torque
Idler lock nut: 27 Nm(2.8 kg·m/20 Ib·ft)
4.Install the radiator.
Refer to "Radiator"in Section 6B Engine Cooling.
5.Connect the vacuum hose from the vacuum pump.
6.Connect the ECM connector and clip.
7.Connect the fuel hose.
·Connect the fuel inlet hose and fuel return hose to fuel supply pump.
8.Install the air intake pipe and hoses.
·Install the pipe and hoses between the intake throttle valve and intercooler.
·Use a new hose clamp,align it with the marking,and tighten it at the specified torque.
Tightening torque
Clamp: 8.0Nm(0.8 kg-m/71 Ib-in)
·Fix the air intake pipe to the bracket.
Tightening torque: 20 Nm(2.0 kg·m/177.5Ib-in)
03.2026 ISUZU E-IDSS Diagnostic Software Download and install at high speed
11.Install the air duct and PCV hose.
Tightening torque Air cleaner side:
Clamp: 6.4 Nm(0.65 kg·m/56.4 Ib-in)
Turbocharger side:
8.0 Nm(0.8 kg·m/71 Ib·in)
9.Connect the boost sensor connector.(Euro4 specification)
Legend
1.Boost sensor connector
10.Install the air intake pipe and hoses.
·Install the pipe and hoses between the turbocharger and intercooler.
·Use a new hose clamp,align it with the marking,and tighten it at the specified torque.
Tightening torque
Clamp: 8.0 N·m(0.8 kg m/71 Ib-in)
·Fix the air intake pipe to the bracket.
Tightening torque: 20 N·m(2.0 kg-m/177.5 Ibin)
07.2025 ISUZU US-IDSS II Truck Diagnostic System Download and Installation
11.Install the air duct and PCV hose.
Tightening torque Air cleaner side:
Clamp: 6.4 Nm(0.65 kg·m/56.4 Ib-in)
Turbocharger side:
8.0 Nm(0.8 kg·m/71 Ib·in)
12.Connect the heater hose.
13.Install the transmission.
Refer to "Manual Transmission"in Section 7B.
14.Install the front exhaust pipe and exhaust brake. Refer to "Exhaust Pipe"and "Exhaust Brake"in Section 6F,Engine Exhaust.
15.Connect the engine ground cable from the frame.
16.Connect the B terminal from the starter motor
17.Installthe cab.(Non-tlt cab model only) Refer to "FRAME AND CAB"Section 2.
18.Refill the engine coolant.
19.Connect the battery cable negative terminal.
没有评论:
发表评论