2025年5月1日星期四

How to Installation ISUZU 4JH1Engine Mount (RH)

 This article describes how to install the Isuzu 4JH1 engine mount (RH)

1.Installthe  support  rubber.

·Install   the   support   rubber   while   raising   the engine.

·Tighten the fixing nuts to the specified torque.

1.Installthe  support  rubber.

·Install   the   support   rubber   while   raising   the engine.

·Tighten the fixing nuts to the specified torque.

2.Install the AC generator drive belt.

Refer    to    "Drive    Belt"in    Section    6B,Engine Cooling.

3.Install the fan shroud.

·Install the fan shroud and clip the reservoir tank hose.

4.Install the cab.(Non-tilt cab model only) Refer to "FRAME AND CAB"Section 2.

5.Refill the engine coolant.

6.Connect the battery cable negative terminal.

 02.2025 ISUZU US-IDSS II Truck Diagnostic System Download and Installation

List of Tightening Torques

 

(a)       82   N·m(8.4   kg-m/61   Ib·ft)

(b)      40N·m(4.1 kg-m/30 Ib·ft)

(c)      48 Nm(4.9 kg-m/35 Ib-ft)

 09.2024 ISUZU E-IDSS Diagnostic Software Download and Installation Service  

没有评论:

发表评论

How to check and adjust the valve clearance of an ISUZU4JH1 engine

   1.Bring  the  piston    in    either    the    No.1    cylind er    or    the   No.4  cylinder  to    TDC    on    the    compression    ...