Installation
1.Installthe support rubber.
·Install the support rubber while raising the engine.
·Tighten the fixing nuts to the specified torque.
Tightening torque
Engine foot side: 82 N·m(8.4 kg·m/61 Ib-ft)
Crossmember side:48N·m(4.9 kg·m/351b·ft)
ISUZU IDSS MX2-T Adapter Diagnostic Professional Tool High Quality
2.Install the AC generator drive belt.
Refer to "Drive Belt"in Section 6B,Engine Cooling.
3.Install the fan shroud.
·Install the fan shroud and clip the reservoir tank hose.
4.Install the cab.(Non-tilt cab model only) Refer to "FRAME AND CAB"Section 2.
[02.2025] ISUZU G-IDSS Global Truck Diagnostic Software Installation Service
5.Refill the engine coolant.
6.Connect the battery cable negative terminal.
List of Tightening Torques
(a) 82 N·m(8.4 kg-m/61 Ib·ft)
(b) 40N·m(4.1 kg-m/30 Ib·ft)
(c) 48 Nm(4.9 kg-m/35 Ib-ft)
没有评论:
发表评论